NEW QUESTION # 11
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing?
Note: There are 2 Correct answers to this question?
- A. Run MRP with quota arrangement
- B. Run PP/DS heuristic for repetitive manufacturing
- C. Assign planned orders manually in the planning table
- D. Assign planned orders manually in the planning table
Answer: A
NEW QUESTION # 12
Generic Parent Generic 1 pt
What is the purpose of collective orders?
- A. To post any component withdrawal as single backflush with order confirmation
- B. To post production costs on a cost collector instead of the production order
- C. To manage production orders for an entire finished product on multiple levels
- D. To combine order management of co-products and by-products with the main product
Answer: C
NEW QUESTION # 13
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Item type
- B. Quantity
- C. Scrap percentage
- D. Installation point
Answer: B,C
Explanation:
The subitems of a bill of material (BOM) are the components that make up the product or assembly. You can maintain the following data for each subitem:
Quantity: This is the number of units of the component that are required for one unit of the product or assembly. You can specify the quantity in different units of measure, such as base unit, order unit, or alternative unit. You can also use variable quantities, such as percentages or formulas, to calculate the quantity dynamically based on the product or assembly characteristics.
Scrap percentage: This is the percentage of the component that is expected to be wasted or lost during the production or assembly process. You can specify the scrap percentage for each component to adjust the quantity accordingly. For example, if the quantity of a component is 10 and the scrap percentage is
5%, the system will increase the quantity by 0.5 to account for the scrap.
The installation point (A) and the item type (B) are not data that you can maintain in the subitems of a BOM.
The installation point is a field in the equipment master record that indicates where the equipment is installed.
The item type is a field in the sales document item that determines the processing and pricing of the item.
These fields are not relevant for the BOM subitems. References:
https://sapstack.com/pp/bom-in-sap-bill-of-material/
https://skillstek.com/bill-of-material-in-sap/
NEW QUESTION # 14
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
- A. Use a specific material status
- B. Use a specific material group
- C. Use a specific MRP list
- D. Use a specific MRP type
Answer: A,D
Explanation:
You can exclude a material from the MRP run by using a specific material status or a specific MRP type. A material status is a user-defined indicator that can be assigned to a material master record to control the procurement and planning activities for the material. For example, you can define a material status that blocks the material from being planned by MRP. An MRP type is a parameter that defines how a material is planned by MRP. For example, you can use the MRP type ND (No Planning) to exclude the material from the MRP run.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 87; [SAP Help Portal: Material Status] and [SAP Help Portal: MRP Type].
NEW QUESTION # 15
For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
- A. In pro duct-related COC, all costs are debited and credited to a product cost collector.
- B. Order-related COC is beneficial in a flexible production environment
- C. Product-related COC is used in manufacturing for co-products
- D. In order-related COC, individual production orders do NOT have cost segments.
Answer: A,C
Explanation:
The difference between order-related and product-related COC is mainly in the level of cost object that is used to collect and analyze the costs of production. In order-related COC, each production order is a cost object that carries its own plan, target, and actual costs. In product-related COC, a product cost collector is a cost object that aggregates the costs of multiple production orders for the same product or product variant. The advantages and disadvantages of each approach depend on the production scenario and the reporting requirements. Some of the factors to consider are:
In product-related COC, all costs are debited and credited to a product cost collector. This means that the production orders linked to the product cost collector do not have any cost segments and do not show any variances. The product cost collector is used for variance calculation and settlement. This simplifies the cost accounting process and reduces the number of cost objects to be managed. However, this also means that the cost details of individual production orders are not available for analysis. Product-related COC is suitable for mass production of standard products with low variance and high volume12.
Order-related COC is beneficial in a flexible production environment where each production order has different characteristics, such as lot size, routing, material components, or quality specifications.
Order-related COC allows for a detailed analysis of the cost and performance of each production order and enables a more accurate allocation of overhead costs. However, order-related COC also requires more effort and resources to maintain and process the cost segments and variances of each production order. Order-related COC is suitable for make-to-order or engineer-to-order scenarios where each production order is unique and customized12.
Product-related COC is used in manufacturing for co-products, which are products that are produced simultaneously from the same production process and have a relatively high sales value. Co-products share the joint costs of the production process based on a predefined apportionment structure.
Product-related COC allows for a consistent and transparent allocation of the joint costs to the co-products and avoids the problem of negative variances that may occur in order-related COC. Product-related COC is suitable for process industries where co-products are common, such as chemical, pharmaceutical, or food industries34.
References:
1: SAP Help Portal: Production Orders in Cost Object Controlling
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 6: Product Cost by Order
3: SAP Help Portal: Product Cost by Period
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Product Cost by Period
NEW QUESTION # 16
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question
- A. Change the item category of the phantom assembly in the bill of material *-' (BOM)
- B. Define the special procurement type inside the BOM
- C. Define the special procurement type inside the material master.
- D. Change the phantom item indicator for the phantom assembly in the bill of material (BOM)
Answer: C,D
NEW QUESTION # 17
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?
- A. Specify a positive offset time.
- B. Specify a positive planning horizon.
- C. Specify a negative planning horizon.
- D. Specify a negative offset time.
Answer: D
NEW QUESTION # 18
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
- A. Resource selection
- B. Resource hierarchy
- C. Resource network
- D. Resource matrix
Answer: A,C
Explanation:
A resource network is a business object in PP/DS that defines the allowed directed connections between two or more resources. A directed connection means that the connection from Resource 1 to Resource 2 is not the same as the inverse connection from Resource 2 to Resource 1. You use this object to model existing production constraints more precisely, with the objective of creating a finite and technically feasible production schedule. Resource networks simplify the modeling of resource restrictions for consecutive operations or orders1 A resource selection is a business object in PP/DS that defines the criteria for selecting a suitable resource for an operation or an order. You use this object to specify the characteristics, attributes, and capacities of the resources that can be used for a particular production process. Resource selection allows you to optimize the resource utilization and reduce the setup times and costs2 A resource matrix is a business object in PP/DS that defines the relationships between different resources based on their characteristics and attributes. You use this object to determine the setup times and costs for changing from one resource to another. Resource matrix allows you to model the setup effort and expense more accurately and improve the production efficiency3 A resource hierarchy is a business object in PP/DS that defines the structure and sequence of resources that are used for a production process. You use this object to represent the logical and physical dependencies of the resources and to control the scheduling and sequencing of the operations or orders. Resource hierarchy allows you to model the production flow and capacity more realistically and ensure the technical feasibility of the production plan.
References:
Resource Network | SAP Help Portal
Resource Selection | SAP Help Portal
Resource Matrix | SAP Help Portal
[Resource Hierarchy | SAP Help Portal]
NEW QUESTION # 19
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?
- A. Find Slot
- B. Squeeze in
- C. Insert operation
- D. Schedule in working time only
Answer: A
NEW QUESTION # 20
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Capacity requirements chart
- C. Order (pool) chart
- D. Orders (dispatched) chart
Answer: A,B
Explanation:
The tabular planning table for capacity planning provides two chart types: the capacity requirements chart and the work center capacities chart. The capacity requirements chart displays the capacity requirements for one or more orders, grouped by order, operation, or work center. The work center capacities chart displays the available capacity and the capacity requirements for one or more work centers, grouped by work center, capacity category, or shift sequence. You can switch between these chart types using the menu options Settings -> Chart type. References: Planning Table (tabular form), Capacity planning table
NEW QUESTION # 21
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
- A. Use a specific material status
- B. Use a specific material group
- C. Use a specific MRP list
- D. Use a specific MRP type
Answer: C,D
NEW QUESTION # 22
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.
- A. Scheduling control
- B. Direction
- C. Planning mode
- D. Fixed pegging
- E. Finiteness level
Answer: A,B,C
NEW QUESTION # 23
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements?
Note: There are 2 correct answers to this question
- A. Operation duration
- B. Total replenishment lead time
- C. Planned delivery time
- D. In-house production time
Answer: C,D
NEW QUESTION # 24
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material?
Note: There are 2 Correct answers to this question?
- A. MRP type
- B. Procurement Type
- C. MRP Groups
- D. Material Type
Answer: A,B
Explanation:
The master data fields that can have an impact on whether MRP creates planned orders or purchase requisitions for a material are:
MRP type: The MRP type is a parameter that defines how a material is planned by MRP. Depending on the MRP type, MRP can create different types of procurement proposals for a material. For example, if the MRP type is PD (MRP), MRP can create either planned orders or purchase requisitions, depending on the procurement type of the material. If the MRP type is VB (Reorder Point Planning), MRP can only create purchase requisitions, regardless of the procurement type of the material.
Procurement type: The procurement type is a parameter that defines how a material is procured, either internally or externally. Depending on the procurement type, MRP can create different types of procurement proposals for a material. For example, if the procurement type is E (External Procurement), MRP can only create purchase requisitions for a material. If the procurement type is X (Both Procurement Types Possible), MRP can create either planned orders or purchase requisitions, depending on the source of supply determination.
The master data fields that do not have an impact on whether MRP creates planned orders or purchase requisitions for a material are:
MRP groups: The MRP groups are parameters that allow you to group materials with similar planning characteristics and assign them common MRP settings, such as planning horizon, lot-sizing procedure, or planning calendar. The MRP groups do not directly affect the type of procurement proposals created by MRP, but they can influence the quantity and timing of the requirements and receipts.
Material type: The material type is a parameter that defines the attributes and properties of a material, such as valuation class, price control, or account determination. The material type does not affect the type of procurement proposals created by MRP, but it can influence the valuation and accounting of the material movements.
References: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 87; [SAP Help Portal: MRP Type] and [SAP Help Portal: Procurement Type].
NEW QUESTION # 25
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.
Note: there are 2 correct answers to this question.
- A. 100% check
- B. Manual maintenance
- C. Simultaneous
- D. First in First out (FIFO).
Answer: A,B
NEW QUESTION # 26
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The same account category is used
- B. The quantity and value updates are the same
- C. The same batch management level is used
- D. The same base unit of measure is used.
Answer: B,D
Explanation:
You can change the material type for a material if stocks, reservations, or purchasing documents exist only if the following conditions are met:
The same base unit of measure is used. This ensures that the material quantity is consistent across different material types.
The quantity and value updates are the same. This ensures that the material valuation is consistent across different material types.
The material is not subject to split valuation. This ensures that the material has only one valuation class and price control. References: [SAP Help Portal] - Change Material Type
NEW QUESTION # 27
What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.
- A. Option to use make-to-order production
- B. Reduced production times
- C. Reduced delivery times
- D. Option to forecast planning for production resources
Answer: C,D
Explanation:
Planned independent requirements (PIRs) are demand elements that represent the sales or production program for a material. They are used to plan the production or procurement of finished products or assemblies in advance, based on the expected demand from customers or internal sources. Some benefits of planning with PIRs are:
Reduced delivery times: By planning with PIRs, you can ensure that the required materials and capacities are available when the actual sales orders arrive. This reduces the lead time for fulfilling the customer orders and improves the delivery performance.
Option to forecast planning for production resources: By planning with PIRs, you can use forecasting methods to estimate the future demand for a material based on historical data and trends. This allows you to adjust the production or procurement plan accordingly and optimize the utilization of production resources, such as machines, labor, and materials. References: [Production Planning with SAP S/4HANA], page 144; [SAP Help Portal: Planned Independent Requirements].
NEW QUESTION # 28
How can you characterize dependent requirements in material requirements planning?
Note: There are 2 correct answers to this question.
- A. They are created on assembly level during the planning run.
- B. They are created with exact times in Advanced Planning.
- C. They are only created for multilevel bill of material (BOM) structures
- D. They are created when an independent requirement is created for the finished product.
Answer: A,D
NEW QUESTION # 29
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with an alternative sequence in the routing
- B. A production line with prioritized work centers
- C. A production line with a parallel sequence in the routing
- D. A production line with more than one work center
Answer: D
NEW QUESTION # 30
......